Office of the Asst. Executive Engineer (Ele.), C, O&M Section -ARAKALUGUDU
RR No |
Account ID |
Bill No |
Billing Period |
Bill Date |
Due Date |
Disconnection Date |
AKTP1132 |
C432101158 |
1432199007709 |
06-Aug-2023 to 01-Sep-2023
|
07-Sep-2023 10:48 |
15-Sep-2023
|
30-Sep-2023
|
Name & Address:
M/S INDUS TOWER LTD-KALLIMUDDANAHALLI
|
Tariff
|
LT7(A)
|
Registration Date
|
N\A |
Contract Demand(KVA)
|
0 |
Average Units
|
0 |
85% of CD (KVA)
|
0 |
Entitlement Units
|
0 |
Recorded Demand (KVA)
|
5 |
Power Cut Energy Entitlement Demand Entitlement
|
0 |
Billing Demand (KVA)
|
3 |
Sanc Load
|
4.000 kW + 0.000 HP
|
Wheeling Energy
|
0
|
Meter Readings for New Meter ID:C981402 and Meter Status: NORMAL |
Description |
Date |
KWH Meter |
Kvah Meter |
MD Meter |
Recorded PF |
Present Reading |
01-09-2023
|
2453 |
0 |
5.1100
|
0
|
Previous Reading |
06-08-2023
|
1266 |
0 |
|
|
Difference |
|
1187
|
0
|
|
|
Meter Constant |
|
1 |
1 |
1 |
|
Consumption |
|
1187
|
|
|
|
SubMeter Consumption |
|
0 |
|
|
|
Wheeled Consumption(Captive) |
|
0 |
|
|
|
Wheeled Consumption(Non Captive) |
|
0 |
|
|
|
Total Wheeled Consumption |
|
0 |
|
|
|
Slow Reading Consumption |
|
0 |
|
|
|
Meter Change Units |
|
0 |
|
|
|
Net Consumption |
|
1187
|
0
|
5.11
|
|
Your Detailed Bill |
Amount (Rs.) |
Description |
Fixed Charges : For The First 3.32 KW at Rs: 200 per KW |
664.00 |
Energy Charges: For The First 1,187.00 Kwh at Rs: 11.5 per Kwh |
13,650.50 |
Fuel Adjustment Charges: 1,187.00 Kwh at Rs: 1.35 per Kwh |
1,602.45 |
Tax For EC Charges :13650.5 At Rs: 0.09 |
1228.540 |
MD Penalty |
332.00 |
Interest |
10.68 |
Current Demand Payable |
17488.17 |
Arrears |
0 |
Bill Rounding Adjustment |
-0.17
|
Net Payable Amount |
17,488.00 |
Amount In words |
Seventeen Thousand Four Hundred and Eighty Eight Rupees only |
Sd/-
Asst Executive Engineer(Ele.)
|
|