Office of the Asst. Executive Engineer (Ele.), C, O&M Section -ARAKALUGUDU
| RR No |
Account ID |
Bill No |
Billing Period |
Bill Date |
Due Date |
Disconnection Date |
| AKTP902 |
C432045850 |
1432199006265 |
14-Feb-2023 to 21-Mar-2023
|
21-Mar-2023 12:40 |
04-Apr-2023
|
19-Apr-2023
|
|
Name & Address:
INDUS TOWERS -2,MOKALI,MOKALI VILLEGE,MOKALI,ROAD
|
Tariff
|
LT7(A)
|
High Cost Energy
|
0 |
|
Contract Demand(KVA)
|
0 |
Special Energy
|
0 |
|
85% of CD (KVA)
|
0 |
Base Consumption
|
0 |
|
Recorded Demand (KVA)
|
7 |
Power Cut Energy Entitlement Demand Entitlement
|
0 |
|
Billing Demand (KVA)
|
0 |
|
Sanc Load
|
4.000 kW + 0.000 HP
|
Wheeling Energy
|
0
|
| Meter Readings for New Meter ID:CC0523767 and Meter Status: NORMAL |
| Description |
Date |
KWH Meter |
Kvah Meter |
MD Meter |
Recorded PF |
| Present Reading |
21-03-2023
|
44000 |
0 |
7.2600
|
0
|
| Previous Reading |
14-02-2023
|
42848 |
0 |
|
|
| Difference |
|
1152
|
0
|
|
|
| Meter Constant |
|
1 |
1 |
1 |
|
| Consumption |
|
1152
|
|
|
|
| SubMeter Consumption |
|
0 |
|
|
|
| Wheeled Consumption |
|
0 |
|
|
|
| Slow Reading Consumption |
|
0 |
|
|
|
| Meter Change Units |
|
0 |
|
|
|
| Net Consumption |
|
1152
|
0
|
7.26
|
|
| Your Detailed Bill |
Amount (Rs.) |
| Description |
| Energy Charges: For The First 1152.000 Kwh at Rs: 11.200 per Kwh |
12,902.40 |
| Fuel Adjustment Charges: 1152.000 Kwh at Rs: 0.530 per Kwh |
610.560 |
| MD Penalty |
8937.50 |
| Tax For EC Charges :12902.4 At Rs: 0.09 |
1161.220 |
| Current Bill Amount |
23611.68 |
| Arrears |
0 |
| Bill Rounding Adjustment |
0.32
|
| Net Payable Amount |
23,612.00 |
| Amount In words |
Twenty Three Thousand Six Hundred Twelve Rupees only |
|
Sd/-
Asst Executive Engineer(Ele.)
|
|